Published:
In manufacturing, the real test of employee transportation is the shift change: one group leaves the plant as another arrives. A poorly planned shuttle schedule produces handover delays and overtime costs.
Staggered departures
Instead of all vehicles leaving at the same minute, departures staggered by 10–15 minutes in line with production-line exit order reduce both gate congestion and waiting times.
Shared-line optimisation
Rather than separate vehicles for a few passengers from neighbouring districts, intelligently merged lines cut cost per person. Occupancy data should be reviewed monthly.
Night-trip safety
Night shifts should run on a door-to-door basis, with drop-off points for female employees chosen along well-lit routes. GPS tracking and on-board cameras matter even more at night.
Flexibility margin
Extra trips and backup vehicles for overtime, maintenance stoppages or order peaks should be defined in the contract in advance.
With deep experience in three-shift plants, Savas Turizm manages your staff shuttle operation end to end.